Project Name: Galveston Interstate 45 Causeway
 
Location: Galveston, TX
   
Client: Texas Department of Transportation
   
Construction Cost: $ 75,000,000
 
Completion Date: 2007
 
Summary:  
   
Alliance provided full concrete inspection and testing services for this $75 million project, which included the replacement of the existing 6-lane, no-shoulder causeway with 8-lanes and 2-shoulder lanes. This project required assistance in meeting rigid schedules to minimize interruption of operations through the causeway. As a result, Alliance routinely works days and nights. Alliance Technicians perform most of their work on offshore barges where complete batch plants and aggregate stockpiles have been set up.
   
   

Related Project Elements

  • Off-shore Concrete Batch Plant Inspection

  • Off-shore Foundation Concrete Inspection

  • Bridge Deck Concrete Inspection
 


About Us | Services | Projects | Commercial/Industrial | Master Planned Communities
Roads/Bridges/Highways | Institutional Facilities | Accreditations | Links
Employment | Contact Us | Site Map | Privacy Policy | Terms of Use

Search Engine Marketing by Directory One