Project
Name: |
Bayport
North Industrial Park |
|
|
Location: |
La Porte, Texas |
|
|
Completion
Date: |
2006 |
|
|
Construction
Cost: |
$20,000,000 |
|
|
Summary: |
|
|
|
Alliance Laboratories,
Inc. provided full geotechnical and construction
materials testing services for this 25 acre site,
including 2 buildings totaling 534,000 SF of warehouse/office
space, 90,000 s.f. of concrete tilt-up panels and
approximately 14 acres of reinforced concrete paving.
Construction materials testing services were also
provided for 90,000 SF of concrete tilt up panels. |
|
|
|
|
Related Project Elements
|
|
- Building Foundations
- Earth fill
- Soil Stabilization
- Concrete Pavement
- Concrete Slabs
- Steel Inspection
- Welding and bolting inspection
- Located on 25 acre site
- Over 20,000 cubic yards of concrete
|
 |
|